Turnkey Engineering, Procurement & Construction

Solar EPC Company Nigeria

Olasupo Energy is a full-scope solar EPC contractor in Nigeria — engineering, procurement, and construction handled by one in-house team, under one contract, with one point of accountability. From feasibility and structural design through grid interconnection and commissioning, we deliver turnkey solar projects from 100kw to 5MW+.

1

contract, full E-P-C scope

100kw–5MW+

project range

8–20 wks

typical build timeline

Solar EPC construction crew building a large-scale array in Nigeria

What Fragmented Contracting Actually Costs a Solar Project

Developers and large power users who split a solar project across separate engineering consultants, equipment suppliers, and civil contractors routinely absorb costs that a single EPC contract avoids: duplicated design fees, procurement markup at every handoff, and finger-pointing between parties when a delay or defect appears on site.

As your EPC contractor, Olasupo Energy carries engineering, procurement, and construction under a single scope and a single warranty. There is one team accountable for schedule, one team accountable for performance, and one contract governing the whole project.

Design fees across separate consultantsDuplicated
Procurement markup across separate vendorsStacked
Points of contact under a single EPC contractOne
Warranty coverage under a single EPC contractUnified

Scope Under a Single EPC Contract

Engineering

Feasibility, structural, single-line & electrical design

Procurement

Direct sourcing from tier-1 panel, inverter & battery manufacturers

Construction

Mounting, DC/AC works, interconnection & commissioning by our own crews

Points of accountability

1

One contractor, one warranty, one schedule

Structural and electrical engineers reviewing solar EPC drawings on site in Nigeria
Why Olasupo Energy

Full-Scope Delivery, No Subcontracted Handoffs

Many "EPC companies" in the Nigerian market are actually brokers — they win the contract, then subcontract design to one firm, procurement to a trading company, and construction to whichever crew is available. Olasupo Energy carries all three scopes internally, which is what lets us hold a single schedule and a single warranty for the full project.

✓

In-house engineering team

Structural, electrical, and civil design handled internally — not outsourced to a third-party consultancy per project.

✓

Direct manufacturer procurement

Panels, inverters, batteries, and mounting structures sourced directly from tier-1 manufacturers, with no trading-house markup.

✓

Owned construction crews

Our certified technicians execute the build and commissioning — we don't subcontract construction to a third party.

✓

Single warranty, single contract

One EPC agreement covers design, equipment, and workmanship, with our team handling ongoing O&M after handover.

Solar EPC Project Scale in Nigeria

EPC engagement typically starts where a project needs structural engineering, procurement management, and multi-crew construction coordination — from a mid-size commercial rooftop to a utility-scale ground-mount plant.

100kw–500kw

Commercial rooftops & mid-size facilities

Typical scopeRooftop + hybrid inverter
Build timeline6–10 weeks
Grid connectionHybrid / grid-tied
Discuss This Scale
Most Common EPC Scope

500kw–2MW

Industrial plants & multi-building sites

Typical scopeGround-mount + structural works
Build timeline10–16 weeks
Grid connectionHybrid / interconnection study
Discuss This Scale

2MW–5MW+

Utility-scale sites & IPP / mini-grid developers

Typical scopeFull civil works + substation
Build timeline16–20 weeks
Grid connectionUtility interconnection
Discuss This Scale
On Site

What a Solar EPC Build Looks Like in Nigeria

A typical EPC scope covers geotechnical and structural assessment, single-line and civil drawings, equipment procurement from tier-1 manufacturers, mounting structure fabrication and installation, DC/AC electrical works, grid or generator interconnection, and full commissioning and testing before handover.

Depending on scale, projects run 8–20 weeks from notice to proceed to commissioning, with our own project managers on site throughout — not a rotating cast of subcontractors.

Tier-1

manufacturer equipment only

On-site

project managers, not rotating subs

Post-COD

O&M handled in-house

20+ years

design life on core equipment

Aerial view of a solar EPC project under construction in Nigeria

Estimate Your Project's Returns

Enter your current diesel or grid spend to see a rough payback estimate for an EPC-delivered solar project at your scale.

☀️

Commercial Solar ROI Calculator

See exactly how much your business saves by going solar

SELECT FACILITY TYPE

₦4.0M
500kva
12 hrs
Engineer reviewing solar EPC feasibility study and site drawings in Nigeria
The EPC Process

How an Olasupo Energy EPC Project Runs

1

Scope & Feasibility

We review your site, load requirements, and objectives, and run a feasibility assessment covering structural, electrical, and interconnection constraints.

2

Engineering & Proposal

Our in-house engineers produce the design package and a transparent, itemized EPC proposal covering the full scope.

3

Procurement

We source equipment directly from tier-1 manufacturers against the approved design — no trading-house handoffs.

4

Construction & Commissioning

Our own crews build, test, and commission the project, sequenced around your operations, then hand over with full documentation.

Discuss Your Project — WhatsApp Us
Our Work

Projects We've Engineered, Procured, and Built

Olasupo Energy delivers EPC solar projects in-house across Nigeria — here's a look at the scale and range of our completed work.

Rooftop solar panel array installed on a Nigerian home
Residential

Home Solar

Rooftop solar systems that keep lights, fans, fridges, and home offices running through outages — sized to your household's real daily usage, not a generic package.

✓

Backup power for essential appliances during grid outages

✓

Battery storage sized to your household's overnight needs

✓

Installed and commissioned by our own certified technicians

3–7 days

typical install time

10+ yrs

warranty coverage

Get a Quote for Home Solar
Commercial solar installation on a retail storefront
Commercial

Business & Commercial

Shops, offices, hotels, and salons running on solar instead of diesel — cutting daily generator costs while keeping operations online through every outage.

✓

Designed around your peak operating hours and equipment load

✓

Reduces or eliminates daily diesel generator running costs

✓

Flexible financing available with little to no upfront cost

18–30 mo

typical payback

100%

uptime through outages

Get a Quote for Business & Commercial
Solar-powered irrigation pump on a Nigerian farm
Agriculture

Farms & Agribusiness

Irrigation pumps, cold rooms, and milling equipment powered without fuel — protecting perishable stock and keeping farm operations running on schedule, rain or shine.

✓

Solar-powered irrigation pumps that run without diesel refills

✓

Cold storage kept online to protect perishable harvests

✓

Sized for milling, drying, and other processing equipment

0

diesel refills needed

20+ yrs

panel lifespan

Get a Quote for Farms & Agribusiness
Large commercial solar array on a factory rooftop
Industrial

Manufacturing & Factories

Full production lines and heavy machinery on hybrid solar systems — engineered in-house for factory-scale loads, from 100kw sites up to multi-megawatt installations.

✓

Systems sized from 100kw up to 5MW for industrial loads

✓

Installed with zero interruption to ongoing production

✓

Hybrid battery and inverter setup for round-the-clock power

100kw–5MW

system range

8–12 wks

install time (500kw)

Get a Quote for Manufacturing & Factories

Solar EPC Questions — Answered

What does 'EPC' mean for a solar project?

EPC stands for Engineering, Procurement, and Construction — a contracting model where a single company handles the design, equipment sourcing, and physical build of a project under one contract, rather than the client managing separate firms for each phase.

What size of project does Olasupo Energy take on as an EPC contractor?

Our EPC scope typically starts around 100kw, where structural engineering and procurement management add real value, up through multi-megawatt utility-scale and industrial projects of 5MW and beyond.

Does Olasupo Energy handle grid or utility interconnection?

Yes. Interconnection design and coordination with the relevant grid operator or utility is part of our engineering scope for hybrid and grid-tied EPC projects.

Who operates and maintains the system after commissioning?

We offer in-house O&M contracts after commercial operation date (COD), covering monitoring, preventive maintenance, and warranty support for the life of the system.

Does Olasupo Energy work with independent power producers (IPPs) or mini-grid developers?

Yes. We take on EPC scopes for IPP and mini-grid developments in addition to corporate and industrial self-consumption projects. Contact us to discuss your project's technical and commercial requirements.

Nationwide Coverage

Solar EPC by Location

We deliver EPC solar projects for developers, businesses, and industrial clients across Nigeria — Lagos, Abuja, Port Harcourt, Kano, Ibadan, Ogun, and beyond. Every project team understands local grid conditions, council and utility requirements, and construction logistics in your area.

Wide view of a completed solar EPC project across a Nigerian site

Ready to Scope Your EPC Project?

Message us on WhatsApp. Our engineers review your site and load requirements, scope the full EPC contract, and deliver it — design to commissioning, with our own team.